Asgard AWS 8908 6-01-83 Aerovane 11-80-11 removed The station was removed after the visit to Marble point and all items including the barrels and RTG were removed. AWS 8908 was subsequently modified to operate on 12 vdc power and reinstalled at Nancy Site along with humidity element which was rechecked at McMurdo before deployment to Nancy Site.