Date: 29/Jan/2010 Time: 11:00 am through 12:00 Pm Took measurements and raised the ADG, lower temperature sensor, and lower enclosure. Work Description Upon arrival we noticed two things. First, the ADG was attached with one mounting bracket, and electrical tape was used as a second point of contact/support for the arm. Second is that the cabling for the ADG is exactly enough to reach from the enclosure to the ADG on the end of the arm. Also the ADG was direct wired into the enclosure. Luckily, there was some cable from the batteries to the enclosure left over so we were able to raise the ADG. The measurements of the tower were as follows, Upon arrival(in inches): Lower temperature sensor: 6 Lower Enclosure: 8.5 Lower Solar: 31 ADG: 16.5 Upper Solar: 87 Boom: 115.5 Junction 17.5 Upper Enclosure: 56 After leaving: ADG: 33 Lower Enclosure: 27 Lower Temp: 25.5