5 February 2005 - Site visited. Boom was only .23 m above surface, and was raised to 2.57 m above the surface. The solar panel was half buried, and the electronics enclosure was located .56 m below the surface. The weight of the snow had also pulled out the cable. The station was raised. An acoustic depth gauge was also installed at 1.19 m above the surface.