Here are my field notes for the re-deployment of Pegasus North: Field team: Melissa and John Install: AWS 21355 Junction box Boom and lower delta T boom Height to bottom of: Lower delta T boom: 33" Junction box: 44" Solar panel: 86" AWS enclosure: 61" Upper boom: 130" Voltage at: Battery box 1: 12.8V Battery box 2: 12.9V AWS power plug: 12.9V Confirmed transmission with Telonics. Pegasus North site was visited on 2/5/09 by Melissa Richards and Dan Steinhoff Work completed: Removed electronics box 21355 Installed electronics box 8923 Installed lower temperature sensor below the current lower delta-T Height to lower temperature sensor: 20" Height to the remaining instruments are the same as the last field report Received 3 successful transmissions. Pegasus North site was visited on 2/6/09 by Melissa Richards and Dan Steinhoff Work completed: * Removed and installed wires inside of the electronics box per George's instructions Received 2 successful transmissions. February 2009- RH is not working, nor is wind speed - direction is fine