ftp/pub/aws/history/1996/Erin.96.txt

Download

Site:
	Erin
	
Performance:
	Station replaced and bgean transmitting 18 january.  Aerovane stopped functioning 6 April.  Station stopped 17 July due to low battery voltage
	and resumed transmission in late September as battery recharged in the austral spring.