ftp/pub/aws/history/1997/Butler_Is.97.txt

Download

Site:
	Butler Island
	
Performance:
	Aerovane replaced 11 February.  Pressure had to be corrected due to a
	failure of the precision time-based correction to the system clock. 
	Aerovane "frozen" most of the time in May and August through November.